rowid,customer_site,customer_name,connection_site,stage,connected,target_energisation_date,connection_status,source,plant_type,project_id,location,type,substation_id,retain_edits,source_id 1,17 acres and bess,aeuk battery project ii ltd,tealing 275/33kv substation,0,0.0,2032/06/30,scoping,she,energy storage system,pro-004392,tealing,gsp,she_gsp_emmock,0,"[""emmo4"", ""teal2""]" 2,aberarder extension wind farm,renewable energy systems limited,tomatin 275/132 kv substation,0,0.0,2031/04/30,scoping,she,energy storage system;wind onshore,pro-002589,tomatin,gsp,she_gsp_tomatin,0,"[""tomt1"", ""tomt2""]" 3,aberarder wind farm,aberarder wind farm llp,aberarder wind farm 132/33kv substation,0,0.0,2026/08/31,consents approved,she,wind onshore,pro-000368,aberarder wind farm,,,0,[] 4,aberdeen offshore wind farm,aberdeen offshore wind farm limited,aberdeen bay 132kv substation,0,95.5,,built,she,wind offshore,pro-000002,aberdeen bay,,,0,[] 5,aberthaw (tertiary),aberthaw green limited,aberthaw 275kv substation,0,0.0,2029/10/31,scoping,nget,energy storage system;pv array (photo voltaic/solar),pro-000376,aberthaw,gsp,nget_gsp_aberthaw,0,"[""abth1"", ""abth2""]" 6,aberthaw energy,aberthaw energy limited,aberthaw 275kv substation,0,0.0,2028/10/30,scoping,nget,energy storage system,pro-001697,aberthaw,gsp,nget_gsp_aberthaw,0,"[""abth1"", ""abth2""]" 7,aberthaw pv & bess generation,cyp solar limited,aberthaw 275kv substation,0,0.0,2029/06/30,scoping,nget,energy storage system,pro-001815,aberthaw,gsp,nget_gsp_aberthaw,0,"[""abth1"", ""abth2""]" 8,abhainn dubh wind farm,e power limited,abhainn dubh wind farm 132kv substation,0,0.0,2029/05/31,scoping,she,wind onshore,pro-002272,abhainn dubh wind farm,,,0,[] 9,achrugan wind farm,statkraft windco 1 limited,achrugan 132kv substation,0,0.0,2029/07/31,scoping,she,energy storage system;wind onshore,pro-002267,achrugan,,,0,[] 10,afon ddaw,lightsource spv 214 limited,aberthaw 275kv substation,0,0.0,2028/10/31,scoping,nget,energy storage system;pv array (photo voltaic/solar),pro-001775,aberthaw,gsp,nget_gsp_aberthaw,0,"[""abth1"", ""abth2""]" 11,afton wind farm,afton wind farm limited,blackhill 132/33kv,0,50.0,,built,spt,wind onshore,pro-000558,blackhill,bsp,spt_bsp_blackhill,0,"[""blah3"", ""blah1""]" 12,aigas (part of the beauly cascade),sse generation limited,aigas hydro 132kv substation,0,20.0,,built,she,hydro,pro-000006,aigas hydro,,,0,[] 13,airies wind farm,airies windfarm limited,newton stewart 132/33kv,0,35.0,,built,spt,wind onshore,pro-000008,newton stewart,bsp,spt_bsp_newtonstewart,0,"[""nets1"", ""nets3""]" 14,akku tealing battery storage,akku tealing limited,tealing 275/33kv substation,0,0.0,2033/10/31,scoping,she,energy storage system,pro-003092,tealing,gsp,she_gsp_emmock,0,"[""emmo4"", ""teal2""]" 15,al boum photo (norton),al boum photo ltd,norton 400kv substation,0,0.0,2031/10/31,consents approved,nget,energy storage system,pro-001651,norton,gsp,nget_gsp_norton,0,"[""nort2"", ""nort4"", ""nort1""]" 16,alcemi bramford battery energy storage facility,alcemi storage developments 1 limited,bramford 400kv substation,0,0.0,2030/10/30,scoping,nget,energy storage system,pro-001416,bramford,gsp,nget_gsp_bramford,0,"[""brfo1"", ""brfo4""]" 17,alcemi coalburn battery energy storage facility,alcemi storage developments 4 limited,coalburn 400kv gis substation,0,0.0,2025/10/31,scoping,spt,energy storage system,pro-001459,coalburn,gsp,spt_gsp_coalburn,0,"[""coal1"", ""coal4""]" 18,alcemi midmill besf,alcemi storage developments 2 limited,kintore 275kv,0,0.0,2029/10/31,scoping,she,energy storage system,pro-002014,kintore,gsp,she_gsp_kintore,0,"[""kint4"", ""kint2""]" 19,alderton pv & bess station,bnrg albion limited,east claydon 400kv substation,0,0.0,2037/10/31,scoping,nget,energy storage system;pv array (photo voltaic/solar),pro-002764,east claydon,gsp,nget_gsp_eastclaydon,0,"[""ecla1"", ""ecla4""]" 20,almondell lodge bess & solar development,sirius ecodev (broxburn) ltd,broxburn 132/33kv,0,0.0,2024/04/30,consents approved,spt,energy storage system;pv array (photo voltaic/solar),pro-001667,broxburn,bsp,spt_bsp_broxburn,0,"[""brox1"", ""brox3""]" 21,alverdiscott,pivoted power llp,alverdiscott 400kv substation,1,0.0,2029/10/31,scoping,nget,energy storage system,pro-001136-1,alverdiscott,gsp,nget_gsp_alverdiscott,0,"[""alve4"", ""alve1""]" 22,alverdiscott,pivoted power llp,alverdiscott 400kv substation,2,0.0,2036/10/31,scoping,nget,energy storage system,pro-001136-2,alverdiscott,gsp,nget_gsp_alverdiscott,0,"[""alve4"", ""alve1""]" 23,alverdiscott,xlinks 1 ltd,alverdiscott 400kv substation,0,0.0,2030/08/30,scoping,nget,interconnector,pro-001344,alverdiscott,gsp,nget_gsp_alverdiscott,0,"[""alve4"", ""alve1""]" 24,alverdiscott 2,xlinks 1 ltd,alverdiscott 400kv substation,0,0.0,2032/08/30,scoping,nget,interconnector,pro-001345,alverdiscott,gsp,nget_gsp_alverdiscott,0,"[""alve4"", ""alve1""]" 25,alverdiscott farm,alverdiscott 10 renewables ltd,alverdiscott 400kv substation,0,0.0,2037/04/24,scoping,nget,energy storage system;pv array (photo voltaic/solar),pro-002554,alverdiscott,gsp,nget_gsp_alverdiscott,0,"[""alve4"", ""alve1""]" 26,alyth bess station,igp international prospecting limited,alyth 400kv substation,0,0.0,2033/10/31,scoping,she,energy storage system,pro-002466,alyth,gsp,she_gsp_alyth,0,"[""alyt4"", ""alyt2""]" 27,amersham substation,sandbrook capital bes ltd,amersham main substation,0,0.0,2037/10/31,scoping,nget,energy storage system,pro-004598,amersham main,,,0,[] 28,amp eccles bess,eccles grid stability limited,eccles 400/132kv,0,0.0,2029/10/31,scoping,spt,energy storage system,pro-003836,eccles,gsp,spt_gsp_eccles,0,"[""eccl4""]" 29,andershaw wind farm,andershaw wind power limited,linnmill 132/33kv,0,35.0,,built,spt,wind onshore,pro-000010,linnmill,bsp,spt_bsp_linnmill,0,"[""linm3"", ""linm1""]" 30,appin wind farm,appin wind farm limited,glenglass 132kv substation,0,0.0,2031/10/31,scoping,spt,wind onshore,pro-002661,glenglass,bsp,spt_bsp_glenglass,0,"[""glgl1"", ""glgl3""]" 31,arecleoch,scottishpower renewables (uk) limited,arecleoch 132/33kv,1,114.0,,built,spt,wind onshore,pro-000012-1,arecleoch,bsp,spt_bsp_arecleoch,0,"[""arec3"", ""arec1""]" 32,arecleoch,scottishpower renewables (uk) limited,arecleoch 132/33kv,2,0.0,2032/06/15,scoping,spt,wind onshore,pro-000012-2,arecleoch,bsp,spt_bsp_arecleoch,0,"[""arec3"", ""arec1""]" 33,arecleoch windfarm extension,scottishpower renewables (uk) limited,arecleoch 132/33kv,0,0.0,2026/08/31,scoping,spt,wind onshore,pro-001111,arecleoch,bsp,spt_bsp_arecleoch,0,"[""arec3"", ""arec1""]" 34,arkwright,arlington (group services) limited,chesterfield 400kv substation (not yet constructed),0,0.0,2034/10/30,scoping,nget,energy storage system,pro-003248,chesterfield,gsp,nget_gsp_chesterfield,0,"[""chte1"", ""chte4"", ""chte2""]" 35,ashbrook lane bess,downing renewable developments llp,wymondley gsp,0,0.0,2031/10/31,scoping,nget,energy storage system,pro-003534,wymondley,gsp,nget_gsp_wymondley,0,"[""wymo1"", ""wymo4""]" 36,assel valley wind farm,assel valley wind energy limited,maybole 132/33kv,0,29.95,,built,spt,wind onshore,pro-000014,maybole,bsp,spt_bsp_maybole,0,"[""mayb1"", ""mayb3""]" 37,auchrobert wind farm,auchrobert wind energy limited,linnmill 132/33kv,0,36.0,,built,spt,wind onshore,pro-000016,linnmill,bsp,spt_bsp_linnmill,0,"[""linm3"", ""linm1""]" 38,auldhouse 200mw bess,apatura battery ltd,strathaven 275/33kv,0,0.0,2031/10/31,scoping,spt,energy storage system,pro-003825,strathaven,gsp,spt_gsp_strathaven,0,"[""stha2"", ""stha3"", ""stha4""]" 39,aultmore wind farm (2023),vattenfall wind power ltd,aultmore wind farm 132/33kv substation,0,0.0,2030/09/30,scoping,she,energy storage system;wind onshore,pro-003975,aultmore wind farm,,,0,[] 40,aurora offshore windfarm,aurora floating offshore wind limited,alverdiscott 400kv substation,0,0.0,2031/10/31,scoping,nget,wind offshore,pro-001774,alverdiscott,gsp,nget_gsp_alverdiscott,0,"[""alve4"", ""alve1""]" 41,axminster,cse25 limited,axminster 400kv substation,0,0.0,2028/10/31,scoping,nget,energy storage system,pro-001740,axminster,gsp,nget_gsp_axminster,0,"[""axmi4"", ""axmi1""]" 42,axminster,hb825axm ltd,axminster 400kv substation,0,0.0,2024/10/31,awaiting consents,nget,energy storage system,pro-001017,axminster,gsp,nget_gsp_axminster,0,"[""axmi4"", ""axmi1""]" 43,axminster,pivoted power llp,axminster 400kv substation,0,0.0,2027/10/31,scoping,nget,energy storage system,pro-001143,axminster,gsp,nget_gsp_axminster,0,"[""axmi4"", ""axmi1""]" 44,ayr energy storage,kxp alpha i limited,ayr 275/33kv,0,0.0,2027/04/30,scoping,spt,energy storage system,pro-003801,ayr,gsp,spt_gsp_ayr,0,"[""ayr-3"", ""ayr-2""]" 45,ayr farm,new energy partnership limited,ayr 275/33kv,0,0.0,2028/05/26,scoping,spt,energy storage system,pro-003596,ayr,gsp,spt_gsp_ayr,0,"[""ayr-3"", ""ayr-2""]" 46,ayre (ex cluaran ear - thuath) offshore wind farm,ayre offshore wind farm limited,banniskirk 400kv substation,0,0.0,2033/10/31,scoping,she,wind offshore,pro-002100,banniskirk,gsp,she_gsp_banniskirk,0,"[""bnsk4"", ""spit2""]" 47,ayrshire grid services facility,flexiblegridpower ltd,hunterston east 400kv substation,0,0.0,2025/09/03,scoping,spt,reactive compensation,pro-001090,hunterston east,gsp,spt_gsp_hunterstoneast,0,"[""hune4"", ""hune1""]" 48,bad a cheo wind farm,rwe renewables uk swindon limited,mybster 3 33kv substation,0,26.65,,built,she,wind onshore,pro-000018,mybster,,,0,[] 49,ballygroggan wind farm,dalriada renewables limited,tangy iv 132kv substation,0,0.0,2034/10/31,scoping,she,wind onshore,pro-003733,tangy iv,,,0,[] 50,balrobert farm bess,elgin energy es co limited,knocknagael 132kv substation,0,0.0,2032/10/31,scoping,she,energy storage system,pro-004118,knocknagael,gsp,she_gsp_knocknagael,0,"[""knoc2"", ""knoc1""]" 51,balvedavist 162 battery storage,sun4net ltd,spittal 132kv substation,0,0.0,2027/07/31,scoping,she,energy storage system,pro-002024,spittal,gsp,she_gsp_spittal,0,"[""spit1""]" 52,bankhead 25mw bess,gpc 1169 ltd,devonside 132/33kv,0,0.0,2030/04/30,scoping,spt,energy storage system,pro-003574,devonside,bsp,spt_bsp_devonside,0,"[""devo3"", ""devo1""]" 53,bankhead bess,apatura battery ltd,eccles 132/33kv,0,0.0,2036/10/30,scoping,spt,energy storage system,pro-003236,eccles,bsp,spt_bsp_eccles,0,"[""eccl3"", ""eccl1""]" 54,barking bess,o&g solar (spv 52) limited,barking 275kv substation,0,0.0,2028/10/31,consents approved,nget,energy storage system;pv array (photo voltaic/solar),pro-003518,barking,gsp,nget_gsp_barking,0,"[""bark2"", ""bark4"", ""barw3"", ""bark1""]" 55,barnby solar farm,ks spv 75 limited,wymondley 400kv substation,0,0.0,2034/10/31,scoping,nget,energy storage system;pv array (photo voltaic/solar),pro-003607,wymondley,gsp,nget_gsp_wymondley,0,"[""wymo1"", ""wymo4""]" 56,barton hill,viridis 178 limited,abham gsp,0,20.88,,built,nget,chp (combined heat and power),pro-000024,abham,gsp,nget_gsp_abham,0,"[""abha4"", ""abha1""]" 57,bearsden bess,bearsden bess ltd,windyhill 275kv substation,1,0.0,2029/10/31,scoping,spt,energy storage system,pro-004404-1,windyhill,gsp,spt_gsp_windyhill,0,"[""wiyh2"", ""wiyh4"", ""wiyh1""]" 58,bearsden bess,bearsden bess ltd,windyhill 275kv substation,2,0.0,2033/10/31,scoping,spt,energy storage system,pro-004404-2,windyhill,gsp,spt_gsp_windyhill,0,"[""wiyh2"", ""wiyh4"", ""wiyh1""]" 59,beaw field wind farm,beaw field shetland limited,beaw field 132/33kv substation,0,0.0,2032/10/29,consents approved,she,wind onshore,pro-000026,beaw field,,,0,[] 60,beech street/city road,citigen (london) limited,beech street/city road substation,0,30.0,,built,nget,chp (combined heat and power),pro-000027,beech street,,,0,[] 61,beinn tharsuinn repower,scottishpower renewables (uk) limited,beinn tharsuinn repower 132/33kv substation,0,0.0,2029/10/31,scoping,she,wind onshore,pro-001035,beinn tharsuinn repower,,,0,[] 62,beinneun wind farm,beinneun wind farm ltd,beinneun 132kv substation,0,109.0,,built,she,wind onshore,pro-000031,beinneun,,,0,[] 63,bendle farm,balance power projects limited,gretna 400/132kv,0,0.0,2031/10/31,scoping,spt,energy storage system,pro-002243,gretna,gsp,spt_gsp_gretna,0,"[""grna4"", ""grna1""]" 64,berkswell (tertiary),enso green holdings limited,berkswell 275kv substation,1,0.0,2025/10/31,scoping,nget,energy storage system;pv array (photo voltaic/solar),pro-000516-1,berkswell,gsp,nget_gsp_berkswell,0,"[""besw2"", ""besw1""]" 65,berkswell (tertiary),enso green holdings limited,berkswell 275kv substation,2,0.0,2027/10/31,scoping,nget,energy storage system;pv array (photo voltaic/solar),pro-000516-2,berkswell,gsp,nget_gsp_berkswell,0,"[""besw2"", ""besw1""]" 66,berkswell energy storage,bw ess development uk limited,berkswell 275kv substation,0,0.0,2026/10/31,awaiting consents,nget,energy storage system,pro-001788,berkswell,gsp,nget_gsp_berkswell,0,"[""besw2"", ""besw1""]" 67,bernicia energy park,baywa r.e. uk limited,stella west 400kv substation,0,0.0,2035/10/30,scoping,nget,energy storage system;pv array (photo voltaic/solar),pro-004541,stella west,gsp,nget_gsp_stellawest,0,"[""sten1"", ""stes1"", ""stew4"", ""stew2""]" 68,berwick bank offshore wind farm c,berwick bank c limited,blyth 400kv substation,0,0.0,2029/11/30,scoping,nget,wind offshore,pro-000513,blyth,gsp,nget_gsp_blyth,0,"[""blyt1"", ""blyt6"", ""blyt2"", ""blyt4""]" 69,berwick solar wind and battery storage,berwick renewables tx limited,berwick 132/33kv,0,0.0,2031/10/31,scoping,spt,energy storage system;pv array (photo voltaic/solar);wind onshore,pro-003490,berwick,bsp,spt_bsp_berwick,0,"[""berw1"", ""berw3""]" 70,bess cilfynydd,rewe 2 limited,cilfynydd 400kv substation,0,0.0,2029/07/12,scoping,nget,energy storage system,pro-002008,cilfynydd,gsp,nget_gsp_cilfynydd,0,"[""cilf4"", ""cilf2""]" 71,bess harker,rewe 4 limited,harker 400kv substation,0,0.0,2031/05/30,consents approved,nget,energy storage system,pro-002010,harker,gsp,nget_gsp_harker,0,"[""hark2"", ""hark1"", ""hark4""]" 72,bess north farm,rewe 5 limited,chickerell 400kv substation,0,0.0,2031/11/01,scoping,nget,energy storage system,pro-002060,chickerell,gsp,nget_gsp_chickerell,0,"[""chic1"", ""chic4""]" 73,bess swan,rewe 3 limited,swansea north 400kv substation,0,0.0,2028/10/31,scoping,nget,energy storage system,pro-002009,swansea north,gsp,nget_gsp_swanseanorth,0,"[""swan2"", ""swan1"", ""swan4""]" 74,bexley gec - hurst grid park 2,bexley green energy centre ltd,hurst 275kv substation,0,0.0,2037/10/31,scoping,nget,energy storage system;pv array (photo voltaic/solar),pro-004546,hurst,gsp,nget_gsp_hurst,0,"[""hurs2"", ""hurs1""]" 75,bhlaraidh extension wind farm,sse generation limited,bhlaraidh 132/33kv substation,0,0.0,2026/04/01,scoping,she,wind onshore,pro-000383,bhlaraidh,,,0,[] 76,bhlaraidh wind farm,sse generation limited,bhlaraidh 132/33kv substation,0,108.0,,built,she,wind onshore,pro-000034,bhlaraidh,,,0,[] 77,bicker fen 1 solar,agr solar 2 limited,bicker fen 400kv substation,1,0.0,2025/05/30,awaiting consents,nget,pv array (photo voltaic/solar),pro-001034-1,bicker fen,gsp,nget_gsp_bickerfen,0,"[""bicf4"", ""bicf1""]" 78,bicker fen 1 solar,agr solar 2 limited,bicker fen 400kv substation,2,0.0,2035/04/01,scoping,nget,pv array (photo voltaic/solar),pro-001034-2,bicker fen,gsp,nget_gsp_bickerfen,0,"[""bicf4"", ""bicf1""]" 79,bicker fen 2 solar,agr solar 3 limited,bicker fen 400kv substation,1,0.0,2026/07/27,awaiting consents,nget,energy storage system;pv array (photo voltaic/solar),pro-001046-1,bicker fen,gsp,nget_gsp_bickerfen,0,"[""bicf4"", ""bicf1""]" 80,bicker fen 2 solar,agr solar 3 limited,bicker fen 400kv substation,2,0.0,2033/04/01,scoping,nget,energy storage system;pv array (photo voltaic/solar),pro-001046-2,bicker fen,gsp,nget_gsp_bickerfen,0,"[""bicf4"", ""bicf1""]" 81,bicker fen pv & bess sub,o&g solar (spv 40) limited,bicker fen 400kv substation,0,0.0,2034/10/30,scoping,nget,energy storage system;pv array (photo voltaic/solar),pro-002575,bicker fen,gsp,nget_gsp_bickerfen,0,"[""bicf4"", ""bicf1""]" 82,bicker fenn energy park,beacon fen energy park limited,bicker fen 400kv substation,0,0.0,2029/06/01,scoping,nget,energy storage system;pv array (photo voltaic/solar),pro-001984,bicker fen,gsp,nget_gsp_bickerfen,0,"[""bicf4"", ""bicf1""]" 83,blackcraig wind farm,blackcraig wind farm (scotland) limited,blackcraig 132/33kv,0,52.9,,built,spt,wind onshore,pro-000035,blackcraig,bsp,spt_bsp_blackcraig,0,"[""blcw1"", ""blcw3""]" 84,blacklaw,scottishpower renewables (uk) limited,blacklaw 132/33kv,1,118.0,,built,spt,energy storage system;wind onshore,pro-000036-1,blacklaw,bsp,spt_bsp_blacklaw,0,"[""blkl1"", ""bllx1"", ""bllx3"", ""blkl3""]" 85,blacklaw,scottishpower renewables (uk) limited,blacklaw 132/33kv,2,0.0,2032/10/08,scoping,spt,energy storage system;wind onshore,pro-000036-2,blacklaw,bsp,spt_bsp_blacklaw,0,"[""blkl1"", ""bllx1"", ""bllx3"", ""blkl3""]" 86,blackpool bess,conrad (blackpool) limited,bispham primary 33kv substation,0,25.3,,built,nget,energy storage system,pro-003080,bispham primary,,,0,[] 87,blair hill wind farm,renewable energy systems limited,glenlee 132/11kv,0,0.0,2036/10/31,scoping,spt,wind onshore,pro-004994,glenlee,bsp,spt_bsp_glenlee,0,"[""glle1"", ""glle5""]" 88,blanket’s farm,noventum power solar 9 limited,warley 275kv substation,0,0.0,2038/10/31,scoping,nget,energy storage system,pro-004469,warley,gsp,nget_gsp_warley,0,"[""warl2"", ""warl1""]" 89,blarghour wind,blarghour wind farm limited,blarghour substation,0,0.0,2027/10/31,consents approved,she,wind onshore,pro-000398,blarghour,,,0,[] 90,blue planet solar,blue planet solar limited,dungeness 400kv substation,0,0.0,2029/10/31,scoping,nget,energy storage system;pv array (photo voltaic/solar),pro-001703,dungeness,gsp,nget_gsp_dungeness,0,"[""dung4"", ""dung2""]" 91,blyth bess,sse renewables solar & battery holdings limited,blyth 275kv substation,0,0.0,2036/10/31,scoping,nget,energy storage system,pro-002817,blyth,gsp,nget_gsp_blyth,0,"[""blyt1"", ""blyt6"", ""blyt2"", ""blyt4""]" 92,bolney,pivoted power llp,bolney 400kv substation,0,0.0,2027/10/31,scoping,nget,energy storage system,pro-001031,bolney,gsp,nget_gsp_bolney,0,"[""boln1"", ""boln4""]" 93,bolney (tertiary),bolney green limited,bolney 400kv substation,1,0.0,2024/10/30,scoping,nget,energy storage system;pv array (photo voltaic/solar),pro-000380-1,bolney,gsp,nget_gsp_bolney,0,"[""boln1"", ""boln4""]" 94,bolney (tertiary),bolney green limited,bolney 400kv substation,2,0.0,2025/10/30,scoping,nget,energy storage system;pv array (photo voltaic/solar),pro-000380-2,bolney,gsp,nget_gsp_bolney,0,"[""boln1"", ""boln4""]" 95,bolney bess,cse45 limited,bolney 400kv substation,0,0.0,2037/09/11,scoping,nget,energy storage system,pro-004026,bolney,gsp,nget_gsp_bolney,0,"[""boln1"", ""boln4""]" 96,bolney farm,dragon green 2 renewables ltd,bolney 400kv substation,0,0.0,2037/10/30,scoping,nget,energy storage system;pv array (photo voltaic/solar),pro-002674,bolney,gsp,nget_gsp_bolney,0,"[""boln1"", ""boln4""]" 97,bolney farm 2,dragon green 7 renewables ltd,bolney 400kv substation,0,0.0,2037/11/30,scoping,nget,energy storage system;pv array (photo voltaic/solar),pro-002733,bolney,gsp,nget_gsp_bolney,0,"[""boln1"", ""boln4""]" 98,bolney grid stability services,wp grid services 13 limited,bolney 400kv substation,0,0.0,2031/10/31,scoping,nget,reactive compensation,pro-003966,bolney,gsp,nget_gsp_bolney,0,"[""boln1"", ""boln4""]" 99,boom power feckenham generation hub,boom power ltd,feckenham 400kv substation,0,0.0,2033/10/31,scoping,nget,energy storage system;pv array (photo voltaic/solar),pro-002312,feckenham,gsp,nget_gsp_feckenham,0,"[""feck6"", ""feck4"", ""feck2""]" 100,boom power llanbabo generation,carrog storage facility limited,wylfa 400kv substation,0,0.0,2028/10/31,awaiting consents,nget,energy storage system,pro-001540,wylfa,gsp,nget_gsp_wylfa,0,"[""wylf1"", ""wylf4""]"